







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Home Additions & ADU Across Enterprise
If you’re planning an addition or an ADU in Enterprise, plan on two approval gates, not one. Every build here clears the county before it clears the subdivision’s design board, and the package that satisfies one won’t necessarily satisfy the other. We know both processes, and we file them together instead of one after the other. Enterprise sits in 89139 on the south valley’s growing edge, where raw desert lots get graded and inspected before a foundation ever goes in. Our crew members have up to 28 years of experience with that sequencing, and a live person answers the phone at (844) 312-0069.
Why Barrett & Sons Construction Sunrise Manor Is Enterprise’s Preferred Home Additions & ADU Company

Barrett & Sons has served the Las Vegas Valley since 1998, owner-operated the whole way. That matters in Enterprise because additions and ADUs here are long projects with real approval risk, and the person who answers for the work is the same one who scopes it. Scope goes in writing. Allowances go in writing. Change orders go in writing before any work moves. If something isn’t done right, the 90-Day Done Right Promise is printed on the contract: one call brings Tom back to make it right.
Enterprise homeowners tend to have been burned once already by an outfit that quoted a phone price and handed over a different bill. Our answer is unchanged: free second opinion on any written estimate, no trip charge inside the county, $40 off any repair over $200, and a permanent 10% senior and veteran discount. His license number is published, so look it up before you sign anything.
Calls reach a live person 24/7, not a voicemail box or an out-of-state call center. And because we’re twenty minutes from most of Enterprise, the crews working your subdivision are the ones who’ll be back next week if a punch item shows up.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Home Additions & ADU Services in Enterprise
ADU Design & Permitting
Permitting is where most Enterprise ADU projects die quietly, and it’s the first thing we take on. That means the site plan, elevations, color and finish schedule, and a dust-control plan for grading on a raw south-valley lot, filed as one packet with the HOA board and Clark County. Submittals filed incomplete are submittals that restart.

New Detached ADU
A detached ADU is a full build from scratch, and in Enterprise that begins with grading, drainage, and wash and stockpile controls before the first form goes down. A typical detached ADU in Enterprise runs $90,000 – $220,000 depending on size, utility runs, and finishes. Our Home Additions & ADU team handles the sequencing so the slab and rough-in happen only after approval.

Garage Conversion ADU
Converting an existing garage is cheaper and faster than building out, but the county still wants a real permit package and the HOA still wants to see how the change reads from the street. Most garage conversions in Enterprise land between $30,000 and $80,000. We pull the permits and get the inspections signed.

Junior ADU & Interior Conversion
A junior ADU or interior conversion works well in the 1990s-and-later tract homes you see across Enterprise, where there’s already usable interior square footage. The trick is electrical, plumbing, and egress brought up to current code without gutting the rest of the house. We scope that in writing before the first wall opens.
Second Story Additions
A second story is the hardest addition to get through design review in Enterprise, because the proposed height, roofline, and stucco tone are all visible from the street. We carry materials that are named and verifiable, including Andersen and Marvin windows, so the elevations match what actually gets installed.
Room Additions and Sunrooms
A single-story room addition reads as a home addition on paper but lives as a match problem: the new stucco, roof tile, and fascia have to blend with what’s already there. A home addition in Enterprise typically runs $45,000 – $130,000. For an enclosed patio, the sun exposure and heat load shape the glazing and shading choices more than the size does.
ADU Site Prep & Utilities
Enterprise adds water and utility runs to a lot that may have been graded only months before. We coordinate trenching, sewer and power routing, and the dust controls required during those earth-moving weeks, so the utility work doesn’t stall the rest of the schedule.
Trusted Brands We Service in Enterprise
Every material in your scope gets named before you sign: KraftMaid and Cambria in kitchens, GAF and CertainTeed roofing, Andersen and Marvin windows, and Belgard or Techo-Bloc for exterior hardscape and walkways around a new addition. When pavers and drive aprons around a new ADU need matching, we can also spec Unilock and Cambridge Pavers. Nothing here is a mystery brand off a van. We don’t stock parts; every material is ordered for your job and verified against the approved finish schedule, so turnaround stays on schedule instead of waiting on a substitute.
Common Home Additions & ADU Problems We See in Enterprise Homes
- Design guidelines ignored until framing starts. The proposed stucco color, tile profile, or wall height doesn’t match the recorded palette, and a stop-work stall follows. That’s a change order and lost weeks.
- Grading begun before dust-control permits and the wash/stockpile plan are in hand. Clark County can shut a raw desert lot down before the first foundation pour, so the permit has to come first.
- Submittal packets filed incomplete. No color and finish schedule, no elevations, no site plan, and HOA architectural review restarts from the top. Most of the calendar slip we see traces back to this.
- Heat and monsoon season taken lightly in scheduling. Concrete pours in triple-digit summer heat and flash-flood drainage during the monsoon window both need to be built into the timeline, not discovered mid-build.
See the difference
Before
After
Before
After
Before
AfterPricing for Home Additions & ADU in Enterprise, NV
Here are the real ranges for Enterprise work. A home addition runs $45,000 – $130,000. A detached ADU runs $90,000 – $220,000. A garage conversion runs $30,000 – $80,000. What moves you within those ranges is size, utility runs to a raw lot, finish level, and how much design review forces a material change. The dust-control plan and grading on a still-developing lot add a step most people don’t price in. We put the full scope, every allowance, and every price change in writing before a nail moves, and your estimate is free. Call (844) 312-0069 with the plans you’re considering.
Line-Item Pricing for Enterprise
| Service | Typical Range in Enterprise |
|---|---|
| Home Addition | $45,000 – $130,000 |
| ADU Construction | $90,000 – $220,000 |
| Garage Conversion | $30,000 – $80,000 |
We Also Serve Cities Near Enterprise
Enterprise projects often put us just across a line. We also serve homeowners in Spring Valley, Paradise, Winchester, and Henderson, and the same double-approval discipline applies in each. If you’re near the Enterprise line and want to talk about an Enterprise addition or ADU, call (844) 312-0069.
Serving Enterprise, NV – Our Local Coverage Area
We serve Enterprise and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Home Additions & ADU in Enterprise

It needs a site plan, elevations, a color and finish schedule, and a dust-control plan for grading on the raw lot, filed as one package. Missing any one of those is the most common reason a submittal comes back and the review restarts. We assemble the packet and file it with both the HOA board and the county. Call (844) 312-0069 for a free second opinion on a packet you’re already putting together.
Plan on weeks, not days, and longer if the first submittal is incomplete. The exact window varies by subdivision, so we sequence the draw schedule around approval rather than guessing. That way the slab and rough-in wait for approval instead of the job sitting half-finished waiting on a committee. Call (844) 312-0069 to get the submittal moving early.
Yes, but the height, roofline, and stucco tone all have to match the existing HOA-approved profile, so the elevations decide it. That’s why we spec named products like Andersen and Marvin windows and verify the finish schedule before filing. Call (844) 312-0069 to talk through what your subdivision’s guidelines actually allow.
You need a dust-control permit and a wash and stockpile plan before any grading on a raw lot, or the county can shut the site down before the foundation pours. Because Enterprise is still being graded on its southern edge, this is routine here and rare in the built-out parts of the metro. We file the plan as part of the packet. Call (844) 312-0069 to get it started.
A written scope, written allowances, and written change orders before any scope change touches the job, backed by the 90-Day Done Right Promise printed on your contract. An allowance that isn’t on paper is a surprise waiting for a date, so we put it there first. Estimates are free, and so is a second opinion on any estimate you already have. Call (844) 312-0069.
Talk Through Your Enterprise Addition or ADU
Whether you’re planning a detached ADU on a raw lot off the southern edge of 89139 or a second story on a 1990s tract home in the heart of Enterprise, the process starts the same way: a submittal packet built right the first time, a dust-control plan filed before grading, and a draw schedule that doesn’t leave the job exposed to a committee. Scope in writing, allowances in writing, change orders in writing. Call (844) 312-0069 for a free estimate on your Home Additions & ADU project in Enterprise.
Written by the team at Barrett & Sons Construction.












